Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Ahuja, V, Yang, J and Shankar, R (2010) Benchmarking Framework to Measure Extent of ICT Adoption for Building Project Management. Journal of Construction Engineering and Management, 136(05), 538–45.

Alnuaimi, A S, Taha, R A, Al Mohsin, M and Al-Harthi, A S (2010) Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman. Journal of Construction Engineering and Management, 136(05), 615–22.

Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2010) Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective. Journal of Construction Engineering and Management, 136(05), 484–94.

  • Type: Journal Article
  • Keywords: China; Infrastructure; Partnerships; Private sector; Procurement; China; Infrastructure; Partnerships; Private sector; Procurement;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000152
  • Abstract:
    With the rapid growth of the Chinese economy, the desperate demand for infrastructure developments has created bottlenecks in the country’s sustainable development. Infrastructure investment could not be funded completely by the government alone. Taking Beijing as an example, there will be about 2,400 infrastructure projects to be developed during 2006–2010 with a total investment of over RMB 470 billion, which may impose budgetary pressure on the government. As a result, public-private partnership (PPP) could be considered as a favorable option to help provide these rapidly demanded public works and services. In order to investigate the potential for adopting PPPs in the People’s Republic of China, this paper aims to explore the critical success factors (CSFs) necessary to conduct PPP projects. The views from Chinese experts were collected via an empirical questionnaire survey. The respondents were invited to rate a total of 18 CSFs that contribute to the success of PPP projects as gleaned from the contemporary literature. The results of this survey were analyzed by the factor analysis technique. The findings showed that the 18 CSFs could be grouped into five underlying factors including: Factor 1—stable macroeconomic environment; Factor 2—shared responsibility between public and private sectors; Factor 3—transparent and efficient procurement process; Factor 4—stable political and social environment; and Factor 5—judicious government control.

Chan, D W M, Chan, A P C, Lam, P T I and Wong, J M W (2010) Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction. Journal of Construction Engineering and Management, 136(05), 495–507.

Cheung, S O, Yiu, T W and Chan, H W (2010) Exploring the Potential for Predicting Project Dispute Resolution Satisfaction Using Logistic Regression. Journal of Construction Engineering and Management, 136(05), 508–17.

Christodoulou, S E, Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum Moment Method for Resource Leveling Using Entropy Maximization. Journal of Construction Engineering and Management, 136(05), 518–27.

Creedy, G D, Skitmore, M and Wong, J K W (2010) Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects. Journal of Construction Engineering and Management, 136(05), 528–37.

Elyamany, A and Abdelrahman, M (2010) Contractor Performance Evaluation for the Best Value of Superpave Projects. Journal of Construction Engineering and Management, 136(05), 606–14.

Horta, I M, Camanho, A S and Da Costa, J M (2010) Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis. Journal of Construction Engineering and Management, 136(05), 581–94.

Javernick-Will, A N and Scott, W R (2010) Who Needs to Know What? Institutional Knowledge and Global Projects. Journal of Construction Engineering and Management, 136(05), 546–57.

Klotz, L and Horman, M (2010) Counterfactual Analysis of Sustainable Project Delivery Processes. Journal of Construction Engineering and Management, 136(05), 595–605.

Lim, J N, Schultmann, F and Ofori, G (2010) Tailoring Competitive Advantages Derived from Innovation to the Needs of Construction Firms. Journal of Construction Engineering and Management, 136(05), 568–80.

Rezgui, Y and Miles, J (2010) Exploring the Potential of SME Alliances in the Construction Sector. Journal of Construction Engineering and Management, 136(05), 558–67.

Yang, L and Shi, J J (2010) Experimental Study on the Impact of Rainfall on RCC Construction. Journal of Construction Engineering and Management, 136(05), 477–83.